中文字幕乱码人妻一区二区三区_日本一卡2卡3卡四卡精品网站_一个人看的www免费视频在线观看_亚洲熟妇无码av_中文在线√天堂

Welcome to the official website of Shenzhen Taiyou Electronic Technology Co., Ltd!

Shenzhen Taiyou Electronic Technology Co., Ltd

20年專注于立式注塑機的生產與制造

24小時全國服務熱線:0755-33855605

Shenzhen Taiyou Electronic Technology Co., Ltd

Address: No.2, North 1st Road, Tianyang Third Road, datianyang Industrial Zone, Songgang town, Bao'an District, Shenzhen
Telephone:0755-33855605
Fax:0755-33855606
E-mail:twtaiyou@163.com
Website:http://www.18852.cn

當前位置:首 頁 ? News ? Industry trends

Six steps to choose the right machine for vertical injection molding machine

文章出處:臺佑電子 | 作者:臺佑電子 | 發表時間:2020-07-06

1. Obtain: Whether the "mold opening stroke" and "mold support stroke" are enough to take out the finished product depends on the mold and the finished product. The opening stroke of the mold should be at least twice the height of the finished product in the direction of mold opening and closing, and should include the gate length. The stroke of the mold support should be sufficient to launch the finished product;


2. Shoot well: "Screw compression ratio" and "shooting pressure" are determined by plastic. Some engineering plastics require a higher injection pressure and a suitable screw compression ratio design to obtain better molding results. Therefore, in order to make the finished product shoot better, the injection pressure and compression ratio should also be considered when selecting the screw. In general, a screw with a smaller diameter can provide a higher injection pressure.


3. Choose the appropriate model: the model and series are determined by the product and plastic. Because there are many types of injection machines, it is necessary to correctly determine at the beginning which injection machine or series should be used to produce this product, such as general thermoplastic or bakelite raw materials or polyester raw materials, they are single color, double color, multi Color, sandwich color or mixed color. In addition, some products require high stability (closed loop), high precision, high rate of fire, high ignition pressure or rapid production (multi-loop). The appropriate series must be selected for production.


4. Coordination: According to the size of the mold, determine whether the "large column inner distance", "mold thickness", "small mold size" and "template size" of the machine are suitable to confirm whether the mold can fit. The width and height of the mold should be less than or at least one side should be less than the distance between the large columns. The width and height of the mold are preferably within the size range of the template; the thickness of the mold should be between the thickness of the injection molding machine. The width and height of the mold should meet the small mold size recommended by the injection molding machine, and it is too small; so far, the specifications of the mold clamping device have been initially determined, and the tonnage of the model has been roughly determined. Then, the following steps must be performed to confirm which injection unit has a screw diameter that meets the requirements.


5. Shoot fast: and confirm the "shooting speed". Some finished products require high injection rate and high speed to be stable, such as ultra-thin finished products. In this case, it may be necessary to confirm whether the machine's injection rate and injection rate are sufficient, and whether it is necessary to match the pressure accumulator, closed loop control and other devices. In general, under the same conditions, a screw capable of providing a higher ignition pressure usually has a lower ignition rate. On the contrary, a screw capable of providing a lower ignition pressure usually has a higher ignition rate. Therefore, when selecting the screw diameter, it is necessary to consider and select the injection amount, injection pressure, and injection rate (injection speed).


6. Full injection: According to the weight of the finished product and the number of die holes, determine the required "injection amount" and select the appropriate "screw diameter". When calculating the weight of the finished product, the number of die holes (a few holes per die) should be considered; for stability, the injection volume should be greater than 1.35 times the weight of the finished product, that is, the finished product weight should be within 75% of the injection volume;

咨詢

Telephone

Consultation telephone

0755-33855605

Service hotline

13902910763

WeChat

二維碼

Mobile website

Mailbox

Enterprise mailbox

twtaiyou@163.com

主站蜘蛛池模板: 亚洲精品狼友在线播放| 国产成人a级毛片| 亚洲av久久久噜噜噜熟女软件| 久久久久亚洲av成人网| av片亚洲国产男人的天堂| 女人高潮内射99精品| 久久精品99久久香蕉国产色戒| 欧美一区二区三区激情| 老鸭窝视频在线观看| 亚洲伊人久久综合影院| 国产久热精品无码激情| 久久精品一区二区东京热| 一边摸一边抽搐一进一出视频| 欧美双人家庭影院| 欧美老妇与禽交| 国产精品美女久久久久久久久| 一边吃奶一边摸做爽视频| 欧洲美妇乱人伦视频网站| 久久精品岛国av一区二区无码| 天堂资源中文最新版在线一区| 亚洲国产天堂久久综合| 中文在线中文资源| 国产精品特级露脸av毛片| 国产亚洲av电影院| 国产乱人伦真实精品视频| 成年免费a级毛片免费看| 国内精品乱码卡一卡2卡麻豆| 高清无码一区二区在线观看吞精| 国精一二二产品无人区免费应用| 午夜精品一区二区三区在线视| 亚洲精品天堂成人片av在线播放| 一本色道久久99一综合| 国语做受对白xxxxx在线| 香港三级韩国三级日本三级| 日本免费一区二区三区最新vr| 7777久久亚洲中文字幕| 亚洲午夜国产精品无码老牛影视| 久久亚洲欧美国产精品| 午夜肉伦伦影院| 国产av永久无码天堂影院| 亚洲大尺度无码无码专线一区|